Points of Interest
-
The renovation lasted from January 2024 to June 2026 and, according to preliminary data, cost 570 million crowns.
-
Following the revitalization, the square features a total of 244 trees. 74 of the previously planted trees have been preserved, and 170 new trees have been added. Rainwater is channeled to the roots via so-called blue-green infrastructure. To facilitate this irrigation method, special layers of substrate containing gravel, biochar, and compost were created beneath the surface.
-
The area in front of the Church of the Sacred Heart of Jesus features large-format paving inspired by Prague Castle, giving rise to a one-of-a-kind venue for cultural events. The pavers are set into a subbase that allows water to infiltrate and subsequently evaporate. The paving is designed to prevent the square from becoming a heat island.
-
85 benches of various types are distributed across the square: 54 single benches, 10 long double-sided benches, 18 circular benches, and 3 additional large benches near the playground, complemented by 6 tables. The amenities also include 41 trash cans and 20 bike racks.
-
The square underwent its last renovation in connection with the construction of the metro in 1981. At that time, however, only part of it was renovated.